The main dock at the Henderson County Riverport was recently used to unload an approximately 105-ton boiler evaporator for delivery to the under-construction Pratt Paper plant.
Sterett Crane and Rigging offloaded the evaporator from a barge using a five-hundred-ton lift capacity crane brought specifically for the job and loaded it to a truck and trailer for final delivery to the Pratt Paper site.
Contact us at 270-577-6133 to discuss handling your special project!